| US |
US 12: from after Mill Street to before Swan Creek Road deer on the roadway Comment: From dusk to dawn, watch for deer on the roadway from milepost 68 (one mile east of Kamiah) to milepost 87 (two miles west of Syringa). last updated May 6 |
| |
| SH |
SH 13: from Wall Creek Road to US Route 12 deer on the roadway Comment: From dusk to dawn, watch for deer on the roadway from milepost 11 (ten miles east of Grangeville) to milepost 26.39 (near Kooskia). last updated May 6 |
| |
| Interstate |
Interstate 15 northbound: at The Cherry Creek Rest Area rest area closed daily — until May 19 Comment: The Cherry Creek Rest Area, located on I-15 at milepost 7.0 Northbound, will be closed for renovations. No temporary facilities will be available and no access will be allowed. The next available services are at the Malad Interchange, milepost 13. The next rest area is at the McCammon Interchange, milepost 47. The Cherry Creek Rest Area is scheduled to reopen mid-May 2008. last updated April 23 |
| |
| Interstate |
Interstate 15: from after Exit 44 - Jensen Road to before Exit 72 - Interstate 86 deer on the roadway -- warning Comment: From milepost 47 to milepost 67, McCammon to Pocatello last updated April 22 |
| |
| Interstate |
Interstate 15: from after Exit 58 - Interstate 15 Business to before Exit 72 - Interstate 86 deer on the roadway -- drive carefully last updated April 22 |
| |
| Interstate |
Interstate 15 northbound: from after Exit 67 - Interstate 15 Business to before Exit 71 - Interstate 15 Business bridge construction, work in the median, shoulder closed daily Comment: This Clark Street Overpass project is on I-15 between mileposts 68.5 and 70.2 in Pocatello. Both northbound and southbound lanes across the bridge decks are open. Landscaping and seeding will be done as weather permits so motorists should expect intermittent lane and shoulder closures both southbound and northbound across the Clark Street Interchange structure. Crews and equipment are still entering and exiting the roadway, as weather permits. Motorists should use extreme caution in the construction area. last updated April 23 |
| |
| Interstate |
Interstate 15 southbound: from after Exit 67 - Interstate 15 Business to before Exit 71 - Interstate 15 Business bridge construction, work in the median because the shoulder is closed to traffic daily Comment: This Clark Street Overpass project is on I-15 between mileposts 68.5 and 70.2 in Pocatello. Both northbound and southbound lanes across the bridge decks are open. Landscaping and seeding will be done as weather permits, so motorists should expect intermittent lane and shoulder closures both northbound and southbound across the Clark Street Interchange structure. Crews and equipment are still entering and exiting the roadway, as weather permits. Motorists should use extreme caution in the construction area. last updated April 23 |
| |
| Interstate |
Interstate 15 northbound: from after Exit 71 - Interstate 15 Business to before Exit 72 - Interstate 86 shoulder closed, bridge maintenance operations, width limit in effect Width limit 12 ' 0 " — until July 19 Comment: WORK ON THIS PROJECT IS BEING DONEAT NIGHT BETWEEN THE HOURS OF 7:00 PM AND 6:00 AM. This bridge maintenance operation on I-15 at milepost 72 will repair the WYE bridges in Pocatello and Chubbuck. Traffic control devices will be removed by 6:00 am each morning. Motorists should expect alternating shoulders to be closed during repairs. Work is currently being done on the I-15 northbound/I-86 westbound ramp. The 12 foot width restriction is during night time hours of operation only. The entire WYE Bridges project is anticipated to be complete by mid July 2008. Motorists should use extreme caution around crews and equipment. last updated April 23 |
| |
| Interstate |
Interstate 15: from Exit 143 - State Highway 33 to Exit 180 - Spenser Road speed restrictions in force, roadway reduced to one lane because the road is being repaved on weekdays and Saturdays Comment: Repaving 24 miles of southbound lanes on I-15 from Dubois to Sage Junction and 13 miles of northbound lanes from Dubois to Spencer. Travel will be reduced to one lane in construction zones, and the speed limit will be reduced to 55 mph. Interstate on- and off-ramps will remain open. Work will take place on weekdays and occasionally on Saturdays. Drivers should anticipate changing driving conditions, such as merging traffic, construction vehicles, construction workers and uneven surfaces. The project is scheduled for completion this fall. last updated May 1 |
| |
| Interstate |
Interstate 15: from Exit 167 - State Highway 22 to The Montana State Line snow, wet pavement last updated today at 12:52 PM Mountain Time |
| |
| US |
US 20: from US Route 95 to Conway Road roadway reduced to one lane, road construction, speed restrictions in force -- look out for flaggers Advisory speed limit 45 MPH — until Tuesday, at about 6:00 PM Mountain Time Comment: The contractor is working at various locations along this route depending on construction activities. Minor delays may be encountered. Watch for flaggers. last updated yesterday at 8:54 AM Mountain Time |
| |
| US |
US 20: at Borchers Lane intersecting road closed, road construction — until May 20 Comment: Aviation Way will be closed north of Franklin Road from April 28th through May 17th for work at the intersection. Traffic turning north onto Aviation Way from Franklin Road will be routed to Marble Front Road via KCID Road or 10th Avenue. Signs will direct motorists through the detour. last updated yesterday at 8:54 AM Mountain Time |
| |
| US |
US 20: from after The South Branch Harrison Canal Bridge to before Thornton Road delays, speed restrictions in force, roadway reduced to one lane, width limit in effect due to road construction work -- look out for flaggers Width limit 12 ' 0 " on weekdays Comment: Resurfacing 6.4 miles of U.S. 20 from the south Rigby exit 320 to the turnoff to Bear World. Expect 15-minute delays. Travel will be reduced to one lane in each direction, with flaggers directing traffic through on- and off-ramps. The speed limit will be reduced to 45 mph, and a width restriction of 12 feet will be in force for commercial vehicles. Work will take place on weekdays between 7 a.m. and 7 p.m., with the project scheduled for completion in August. Drivers should be particularly careful when entering U.S. 20 from county roads. last updated May 2 |
| |
| US |
US 20: from after The South Ashton City Limits to before Harriman State Park rock fall Comment: Watch for falling rocks from Milepost 354 to Milepost 379. last updated April 14 |
| |
| US |
US 26 in both directions: from 2325 East Road to before 2400 East Road road construction, truck restrictions in force -- look out for flaggers Width limit 11 ' 0 ", Speed limit 45 MPH — until May 27 Comment: Be prepared to stop or slow for construction at intersection with Avonmore Road (milepost 154.3) in Gooding County between Gooding and Shoshone. Work will impact traffic intermittently during construction. Speed limit through construction zone is 45 mph. An 11-foot width restriction is in place through the construction zone. For loads over 11 feet, call one hour prior to arrival at construction site - Bill (208)316-0511, Clyde (208)886-7827, or Tom (208)316-0499. For construction information, contact Idaho Sand & Gravel, Larry Covey, at 208-324-5100. For traffic control information, contact Amerigo, Marc Massey, 208-604-2053. last updated April 21 |
| |
| US |
US 26: at The Clark Hill Rest Area rest area closed Comment: Reconstructing the Clark Hill Rest Area on U.S. 26 east of Ririe at milepost 359. The new rest area is scheduled to open in May. Temporary rest facilities are not available. last updated April 7 |
| |
| US |
US 26: from after The Clark Hill Rest Area to The Wyoming State Line deer on the roadway last updated April 22 |
| |
| US |
US 30 in both directions: from after Crystal Springs Road to before Center Street West speed restrictions in force, width limit in effect, road construction Width limit 16 ' 0 ", Speed limit 55 MPH on weekdays — until November 30 Comment: US-30, Topaz to Lava Hot Springs. (Referring to the "Topaz" Bridge, east of McCammon.) This major widening project on US-30 from mileposts 365-370 began August 21, 2006 and is expected to be completed by the end of November 2008. This project has been shut down for the 2007 Winter season. However, a 16 foot width restriction is still in effect from mileposts 366 to 369. The speed limit has been raised to 55 mph. last updated April 23 |
| |
| US |
US 30: at Center Street West speed restrictions in force, intersecting road closed, bridge construction -- detour in operation Speed limit 35 MPH — until May 23 Comment: The Center Street (west) access into Lava Hot Springs will be closed. A detour will be in effect for both vehicles and pedestrians. Vehicles should use the Main Street (east) access into Lava Hot Springs. Vehicles will be required to slow to 35mph on US-30 at Lava Hot Springs. last updated April 23 |
| |
| SH |
SH 34 northbound: from after US Route 30; Second Street South to Third East Street roadway reduced to two lanes, paving operations, road construction, bridge construction, height limit in effect -- detour in operation Height limit 14 ' 0 " Comment: This project on SH-34 between mileposts 57.8, 3rd Street Overpass, and 58.05 will replace the pavement, curb, gutter, sidewalk, parapit and illumination at the 3rd Street Railroad Bridge in Soda Springs. Traffic has been shifted to the two northbound lanes. DETOUR IN EFFECT IS FOR VEHICLES OVER 12 FEET IN WIDTH, AND LEGAL HEIGHT ONLY. Work is expected to be complete by Fall 2008. Motorists should use caution around crews and equipment. last updated April 23 |
| |
| SH |
SH 44: from Strawberry Glenn Road to Glenwood Road roadway reduced to one lane, road construction — until May 15 Comment: THIS WORK BEING DONE AT NIGHT FROM 10:00 PM TO 5:00 AM DAILY. Expect ocasional flaggers, work requiring lane closures will be done at night. Work consists of constructing curb, gutter, and sidewalk from the Boise River Bridge, on Glenwood Ave. to Riverside Drive on the East side of the highway. last updated yesterday at 8:54 AM Mountain Time |
| |
| SH |
SH 45: from Melba Road to Deer Flat Road roadway reduced to one lane, speed restrictions in force, paving operations, road construction -- look out for flaggers, pilot car in operation, consider using an alternate route Speed limit 55 MPH,. Expect 15 - minute delays. — until May 21 Comment: This road construction project will span from milepost 14.1 (Melba Rd) to 22.2 (Deer Flat Rd) on SH-45 as a pavement rehab operation to restore and improve the existing base and pavement surface. last updated yesterday at 8:54 AM Mountain Time |
| |
| SH |
SH 72: from US Route 30 to State Highway 52 lane closed, delays because of road maintenance activities -- look out for flaggers. Expect 10 - minute delays. Comment: Depending on weather, you may encounter a pavement testing operation 11:00am - 2:00pm on Tuesday of this week, at milepost 0 - 2, south of New Plymouth. last updated May 6 |
| |
| SH |
SH 75: from after The South Clayton City Limits to before State Highway 21 rock fall, deer on the roadway Comment: From Milepost 217.19 to Milepost 189. last updated April 14 |
| |
| SH |
SH 75: from after Redfish Lake Road to before Squaw Creek Road deer on the roadway Comment: Milepost 189 to Milepost 217 last updated April 16 |
| |
| SH |
SH 75: between Sullivan Hot Springs Road and East Fork Road roadway reduced to one lane, speed restrictions in force, width limit in effect due to bridge construction work Width limit 9 ' 0 " daily — until May 29 Comment: Replacing the Salmon River Bridge 2 miles west of Clayton at milepost 220. Construction will continue through May. During construction, the highway will be remain open, but the speed limit will be reduced to 45 mph and there may be temporary delays. Work will take place between 7 a.m. and 5:30 p.m. six days a week. The width limit for all vehicles is 9 feet. last updated April 24 |
| |
| Interstate |
Interstate 84 in both directions: at The Oregon State Line roadway reduced to one lane, bridge construction, width limit in effect, speed restrictions in force Width limit 12 ' 0 ", Speed limit 55 MPH — until October 31 Comment: The Oregon Department of Transportation will be doing work on the Westbound Bridge this summer. Westbound will be closed, all traffic will be diverted to the eastbound structure while the contractor works on the westbound side. For more information please contact Oregon DOT at 541-889-9115. No loads over 12' wide allowed. The detour will be as follows: Westbound: Take Exit 3 off I-84, to Northbound US-95 to Gayway Junction, turn left onto US-30 to I-84 Oregon Exit 376 westbound entrance ramp. Eastbound: Take Exit 376 off I=84, turn left onto eastbound US-30 to Gayway Junction, turn right onto US-95 South to I-84 Exit 3 westbound entrance ramp . last updated yesterday at 8:55 AM Mountain Time |
| |
| Interstate |
Interstate 84: at The Snake River View Rest Area rest area closed — until May 16 Comment: The Snake River View Rest Area (located on I-84 at Milepost 1 Eastbound, this is 1 mile from the Oregon/Idaho border) will be closed for building remodel and landscaping. There will be no temporary facilities available and no access will be allowed. The next rest area eastbound is at Blacks Creek located at Milepost 62, east of Boise. Westbound travelers can use the Oregon rest area located just 1 mile from the Idaho/Oregon Border. The rest area is scheduled to be reopened mid-May 2008. last updated yesterday at 8:55 AM Mountain Time |
| |
| Interstate |
Interstate 84: at Exit 29 - Franklin Road road construction, bridge construction, speed restrictions in force, speed restrictions in force Advisory speed limit 55 MPH on weekdays — until September 1 Comment: This work consists of building a new structure over the Interstate at Franklin Road (milepost 29) in Caldwell last updated yesterday at 8:55 AM Mountain Time |
| |
| Interstate |
Interstate 84 westbound: from Exit 50 - Overland Road to Exit 54 - Broadway Avenue roadway reduced to one lane, road construction, work in the median, speed restrictions in force Speed limit 55 MPH — until January 10, 2009 Comment: This work will be done along I-84 Between Cole Road (milepost 51.3) and Broadway Ave (milepost 54.6) Westbound for the installation of soundwalls. last updated yesterday at 9:19 AM Mountain Time |
| |
| Interstate |
Interstate 84 in both directions: from Exit 173 - US Route 93 to Exit 182 - State Highway 50 road maintenance operations, speed restrictions in force, roadway reduced to one lane, truck restrictions in force Width limit 14 ' 0 " — until May 30 Comment: One lane closed in both directions of Interstate 84 due to concrete pavement repair project from Junction U.S. 93 to State Highway 50 interchange (mileposts173 to 182). Speed limit reduced to 65 mph. Width restriction of 14 feet between working hours of 6 a.m. to 6 p.m. Monday through Friday. Traffic lane closure during working hours only. Contractor Contact: Multiple Concrete Enterprises, 801-725-3532 Traffic Control: Amerigo, 208-234-2181 last updated April 16 |
| |
| Interstate |
Interstate 84 eastbound: from after Exit 188 - Valley Road to before Exit 194 - Ridgeway Road bridge construction, left lane closed — until May 30 Comment: Left lane closed at mile 189.5 for bridge repairs on 1900 East Road overpass bridge. Lane closure will be in effect 24-hours/7 days per week. No lane closure on west-bound lanes. Contractor contact: Cannon Builders, 208-785-6281 Traffic Control: Amerigo, 208-234-2181 last updated April 16 |
| |
| Interstate |
Interstate 84 westbound: from after Exit 194 - Ridgeway Road to before Exit 201 - Kasota Road shoulder closed, damage to bridge -- approach with care Comment: The shoulder of Interstate 84 at the Crestview Road overpass west of Burley will remain closed awaiting repairs after a truck hit a support girder. The damaged section is located on the north side of the westbound lane at milepost 197.61, which is about three miles west of the Kasota Road interchange. last updated March 31 |
| |
| Interstate |
Interstate 90 westbound: from Exit 15 - Sherman Avenue to The Washington State Line roadway reduced to one lane due to road construction work last updated May 6 |
| |
| Interstate |
Interstate 90 westbound: from Exit 7 - State Highway 41 to Exit 11 - I-90B (Northwest Boulevard) speed restrictions in force Speed limit 55 MPH Comment: The approaches getting on and off the west bound bridges between Coeur d' Alene and Post falls are rough. The bridges affected are: Atlas Road at mile post 10.35, Huetter Road at mile post 9.24, and State Highway 41 at mile post 7.14. last updated yesterday at 8:37 AM Mountain Time |
| |
| US |
US 95 northbound: from Mercer Drive to D Avenue roadway reduced to three lanes, left lane closed, road construction, work in the median — until June 15 Comment: The Right Lane of the Highway between milepost 38.6 to milepost 39.2 (in Wilder) will be closed for sidewalk work. last updated yesterday at 8:55 AM Mountain Time |
| |
| US |
US 95: from Neider Avenue to Hayden Avenue roadway reduced to one lane, delays, road maintenance operations. Expect 15 - minute delays. on weekdays — until May 15 Comment: Sporadic night time lane closures as required to install video detection equipment on traffic signal cross arms at the following intersecting avenues: Neider, Bosanko, Kathleen, Dalton, Hanley, Canfield, Prairie and Hayden. When necessary lane closures will be between 7:00 PM and 5:30 AM Pacific Time. last updated March 17 |
| |
| US |
US 95 in both directions: between Bunco Road - Brunner Road and Sonshine Road major event, delays -- look out for flaggers — until tomorrow at about 1:00 AM Mountain Time Comment: Silverwood Theme Park will be controlling traffic in and out of the park at mile post 446.3 last updated May 5 |
| |
| SH |
SH 97 in both directions: at Blue Lake Road bridge construction, roadway reduced to one lane, delays, width limit in effect Width limit 12 ' 0 ",. Expect 15 - minute delays. Comment: Harrison Bridge project at mile post 69.14 approximately 2 miles north of Harrison. Traffic signals are in use. Depending on the level of the river, there may be a height restriction for boats on the Coeur d'Alene river going under the Harrison bridge. last updated April 14 |
| |
| SH |
SH 97 in both directions: between Flicker Lane and Burma Road bridge construction, width limit in effect Width limit 12 ' 0 " Comment: Turner Creek Bridge (at milepost 82.21 approximatley thirteen miles north of Harrison) is being replaced. Temporary gravel road surface is in place. last updated April 14 |